DESCRIPTION
Prefeasibility Study and Stage I Electrical Studies.
Participation as Owner Engineer dedicated to the preliminary study to determine the maximum injection power in SE B2 of 33 kV nominal voltage and future ET EB2 of 132 kV nominal voltage, and to the E1 Electrical studies for the determined maximum power.