Wind Plant Patagonia Norte I
DESCRIPTION Prefeasibility Study and Stage I Electrical Studies. Participation as Owner Engineer dedicated to the […]
DESCRIPTION Prefeasibility Study and Stage I Electrical Studies. Participation as Owner Engineer dedicated to the […]
DESCRIPTION Project Management and Field Supervision of the electrical works of the Wind Farm, which
DESCRIPTION Participation as Owner Engineer in the previous study to determine maximum injection power, in