DESCRIPTION
Engineering and Supplies
- Detailed Engineering: Review of basic engineering and execution of comprehensive detailed engineering for connecting the generating plant to the 33 kV and 13.2 kV networks.
- Procurement Management: Supply and logistics of medium-voltage conductors, structures, switching equipment, and conduit materials.
Civil Infrastructure and Conduits
- Foundation Works: Construction of reinforced concrete foundations for line poles and support structures.
- Underground Conduit Systems: Excavation, installation of conduit, and construction of inspection and pull chambers for conductor stringing.
Electromechanical Assembly and Connectivity
- Medium-Voltage Conductor Stringing: Installation of 33 kV and 13.2 kV conductors, using tray and underground methods.
- Pole and Structure Installation: Assembly and configuration of switching and metering equipment, including circuit breakers, disconnectors, and voltage and current transformers.
- Switches and Metering: Connection of primary switchgear and installation of the 13.2 kV metering station.
Commissioning and Handover
- Grid Connection: Final connection of the poles to the existing line.
Project Details
• PROJECT’S NAME:
Ituzaingó CT Electrical Interconnection
• CATEGORY:
• REGION:
Ituzaingó, Corrientes
• PRINCIPAL:
TERMOELECTRICA S.A.
• PARTICIPATION:
EPC
• EXECUTION DATE:
May 2024 – September 2024