DESCRIPTION
Project Management and Field Supervision of the electrical works of the Wind Farm, which includes:
- New E.T. 33-132 kV connection.
- Connection to LAT 132 kV.
The work carried out by Dreicon includes:
Project Management of electrical works, coordination of the supervision of electrical works, technical representation before the client, engineering review, monitoring of the execution of the schedule and planning of the work, advice on technical and administrative tasks, work certification, preparation monthly progress reports, testing of materials and equipment in the factory and on site, final work trials and tests, issuance of service orders, receipt of order notes and management of all documentation received at the Worksite
Engineer Alberto Franco, head of construction inspections at Dreicon S.A., serves as manager of the electrical works in the field, based on the project since May 2018.
Eng. Gerardo Manhard, project director and partner at Dreicon S.A., is in charge of the general management of the project.
Engineer Juan Pablo Del Conti acts as advisor to the general director of the project (Eng. Gerardo Manhard) and the manager of the electrical works in the field (Eng. Alberto Franco) on the civil engineering aspects linked to the electrical works.
PROJECT DETAILS
• PROJECT’S NAME:
Wind Power Plant La Banderita
• ENERGY TYPE:
• REGION:
La Pampa, Argentina
• PRINCIPAL:
INGENER – Grupo FRALI
• PARTICIPATION:
PM
• EXECUTION DATE:
May 2018